跳转到内容
Agentic Workflowdocs
v0.8.2免费安装

节点 / builtin / trigger

Schedule

Run the flow at a specific time.

触发器 扩展程序网页应用

此内容尚不支持你的语言。

Run the workflow automatically at set times: every few minutes, daily at 9:00, every Monday, on the 1st of the month.

Schedule starts the workflow on the rules you set, once the workflow is published. Each rule picks a Trigger Interval and then asks only for what that interval needs:

Trigger Interval You set
seconds Seconds Between Triggers (at least 10)
minutes Minutes Between Triggers
hours Hours Between Triggers and, optionally, Trigger at Minute
days Days Between Triggers, Trigger at Hour, Trigger at Minute
weeks Weeks Between Triggers, the weekdays (field Units), Trigger at Hour, Trigger at Minute
months Months Between Triggers, Trigger at Day of Month, Trigger at Hour, Trigger at Minute

Add several rules to combine schedules, for example weekdays at 9:00 plus Saturdays at noon.

Daily, weekly and monthly schedules (and hourly ones pinned to a minute) stay on the same local clock time when daylight saving time changes.

  • Daily reports, digests and reminders.
  • Regular checks: a price, a page, an inbox.
  • Routines that run an agent at set times, with Run agent.
设置项类型作用
Rules (必填)List

Rules changes shape with its Trigger Interval choice:

6 个选项 · 选择“Trigger Interval”以查看其设置

seconds 的设置

设置项类型作用
Seconds Between Triggers (必填)NumberSeconds between each run. Note: the browser floors alarms at ~1 minute, so second-level schedules are best-effort — the minimum is 10s and short intervals are effectively rounded up to about 1 minute. For reliable sub-minute timing, keep the flow running yourself.

正在显示 seconds 的设置

  • Output

Each output item has these fields:

Field类型What it holds
scheduled Always true
Shape of an output item
{
"scheduled": true
}

Schedule only sends { "scheduled": true }. It carries no date or other context; use Get Current Date when the next steps need the time.

None. This node needs no connection and has no slots for other nodes.

  1. Schedule with one rule: days, Days Between Triggers 1, Trigger at Hour 8 AM, Trigger at Minute 0.
  2. RSS Feed Read fetches a feed.
  3. Limit keeps the 5 newest posts.
  4. Telegram sends them to you.
  • The workflow never runs on its own. Publish the workflow: schedules only run for published workflows. To test, run it from the canvas.
  • A seconds schedule runs about once a minute. The browser runs scheduled alarms at most about once a minute, so second-level schedules are approximate. The minimum is 10 seconds.
  • A monthly schedule skipped a month. That month has no such day (for example the 31st). Pick a day that every month has, such as the 1st or the 28th.
编辑此页

最近更新:

Was this page useful?
向 Aria 询问“Schedule”